Preserving Pisa's Treasure
Pisa's bell tower, a prime example of Romanesque architecture, would be renowned even if it did not lean. Construction of the tower began in 1173 and was not completed until...

Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....

Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

Big Idea
The reconstruction of the Big I�the intersection of interstate routes 25 and 40 in Albuquerque that was named for its appearance from the sky�was likely to disrupt commuters and interstate...

Improving the Process
By revamping its solids treatment system, the wastewater utility in Louisville, Kentucky, eliminated odors, created a potential source of new revenue, and saved millions of dollars in...

Clean Water at the Crossroads
Thirty years after the passage of the Clean Water Act, the quality of effluent from the nation's wastewater treatment plants has improved considerably. However, much of the...

Environmental Technology Verification Report for the Plasma Enhanced Melter
Prepared by the Environmental Technology Evaluation Center (EvTEC), a service center of CERF/IIEC. This Technology Verification report describes the...

Uses and Limitations of Conventional Hydraulic Models in the Planning and Design of Storage Tunnels
The hydraulic design of storage tunnels requires special considerations relative to the design of conventional sewers. These issues include characterization and control of inflows, energy...

Multifaceted Trenchless Rehabilitation at the Middletown, Ohio WWTP
This paper describes the multiple trenchless technologies that were evaluated and the ones that were applied to the rehabilitation of a 78la diameter corrugated metal influent line and...

Economic Restoration of Concrete Infrastructure at Jefferson Parish, Louisiana
United States municipalities are spending hundreds of millions of dollars annually tore place and repair corroded concrete infrastructures in wastewater systems. Structures such as wet...

Penn State's Graduate Option in Watershed Stewardship
A Graduate Option in Watershed Stewardship has been created at Penn State with the objective of educating water resources students to implement team-oriented, interdisciplinary problem...

An Innovative Stormwater Management Project in Sydney, Australia
Presented in this proposed paper will be derails of a project implemented in Sydney, Australia aimed at addressing this need for information regarding the implementation and effectiveness...

Better BMP Practices
A study of the professional literature indicates that the meaning of the term BMP, literally signifying a Best Management Practice, has diverged, depending on the professional field. Use...

Tamarack Managed Groundwater Recharge Project
A managed groundwater recharge project was begun in the Fall 1996 at the Tamarack Ranch State Wildlife Area (SWA) owned by the Colorado Division of Wildlife near Crook in northeast Colorado....

A Glass Act
The Museum of Glass under construction in Tacoma, Washington, is the centerpiece of a plan to develop brownfield sites on the Thea Foss Waterway. The $57.3-million museum project includes...

Cliff-Hanger
To create an arch bridge over a river gorge in Oregon without disturbing the canyon walls or floor below, engineers combined a segmental construction scheme with a temporary cable-stay...

Making the Most of HPC
Developing high-performance concrete (HPC) was only the first step toward bringing a material with improved durability, strength, constructability, and mechanical properties to the bridge...

The Future of Airports
Through a series of meetings and surveys, professionals involved in the design, engineering, construction, and maintenance of airports throughout the United States and Canada have identified...

 

 

 

 

Return to search